-
Kenai Municipal Airport – Kenai, AK
This project involved interior/exterior renovations of approximately 26,000 SF of terminal space and a 2,300 SF expansion for new arrivals, ticketed passenger waiting, and baggage handling areas. Work included replacing or upgrading all interior/exterior finishes, most mechanical and electrical systems, and baggage handling systems throughout the terminal. Space was added to the tarmac side of…
-
Auke Bay Integrated Science Building – Juneau, AK
Two-story, 11,200 square foot classroom, office, and laboratory building. In addition to lab and storage spaces, the new building houses a 40-student classroom, several faculty offices, an open workspace, and a collaboration space, among others. The hands-on learning labs, include a water/soils ecology lab with an attached clean room, and a forest ecology/glaciology/geophysics lab with…
-
Kenaitze Education Center – Kenai, AK
The 67,000-square-foot building, includes education and other community spaces. The building is laid out in two wings connected by an interior plaza. The education wing has classrooms and meeting spaces for the Tribe’s Early Learning preschool, K-12 Yaghanen Youth Language and Culture Program, Community Education and Career Training, and the Dena’ina Language Institute. The second…
-
South Maui Community Park Recreation Center – Kihei, HI
The South Maui Community Park Recreation Center project was a new construction of a 32,000 square foot gymnasium in Kihei, HI. This included an extensive civil sitework project which consisted of roughly 5 acres of development with utilities, retaining wall, new parking and basalt removal. The recreation center itself entailed a metal building for the…
-
Seward Visitor Center – Seward, AK
The Seward Visitor Center included a complete exterior and interior remodel with the addition of an elevator. This also included added electrical systems to help facilitate audio and visual equipment involved in a separate contract for displays within the building. Some of the more difficulties of the project including adding the addition during the rainy…
-
SPH Operating Room – Homer, AK
The SPH Operating Room Project consisted of a full renovation to the existing two operating rooms in the facility. This was always done while maintaining one open operating room throughout the duration of construction. The main portion of the project included over a million dollars’ worth of mechanical work which consisted of a new HVAC…
-
Chapman Elementary School – Anchor Point, AK
The Chapman Elementary School project consisted removal of hazardous materials and replacement of exterior windows and siding. This also included other misc finishes on the exterior and interior to complement the main points of the contract. Blazy was able to work in the confines of the time frame to get the long lead siding ordered…
-
McDonalds Renovation – Soldotna, AK
The Soldotna McDonalds Renovation consisted of a remodel of the existing customer space and exterior façade within a short time frame that Blazy was able to complete on time. McDonalds upgraded the interior space with new finishes, new bathrooms, casework, countertops and tile on the interior. On the exterior, the mansard roof was removed and…
-
Tordrillo Mountain Lodge – Judd Lake, AK
Tordrillo Mountain Lodge is a remote, luxury lodge on Judd Lake that is only accessed by helicopter or float plane. This job consisted of 6 new buildings and 1 addition to the existing lodge. The project presented a number of challenges including completing all construction in a 6 month time frame during the winter months…
-
Kenai Reservoir #2 – Kenai, AK
The Kenai Reservoir project consisted of large diameter underground water pipe to be tied into the existing City water lines for the new 1-million-gallon water storage tank erected onsite. The storage tank itself included welded steel sheets built on a concrete foundation. The finishes were completed with priming and painting of the entire tank inside…