-
South Maui Community Park Recreation Center – Kihei, HI
The South Maui Community Park Recreation Center project was a new construction of a 32,000 square foot gymnasium in Kihei, HI. This included an extensive civil sitework project which consisted of roughly 5 acres of development with utilities, retaining wall, new parking and basalt removal. The recreation center itself entailed a metal building for the…
-
McDonalds Renovation – Soldotna, AK
The Soldotna McDonalds Renovation consisted of a remodel of the existing customer space and exterior façade within a short time frame that Blazy was able to complete on time. McDonalds upgraded the interior space with new finishes, new bathrooms, casework, countertops and tile on the interior. On the exterior, the mansard roof was removed and…
-
Seward Visitor Center – Seward, AK
The Seward Visitor Center included a complete exterior and interior remodel with the addition of an elevator. This also included added electrical systems to help facilitate audio and visual equipment involved in a separate contract for displays within the building. Some of the more difficulties of the project including adding the addition during the rainy…
-
SPH Operating Room – Homer, AK
The SPH Operating Room Project consisted of a full renovation to the existing two operating rooms in the facility. This was always done while maintaining one open operating room throughout the duration of construction. The main portion of the project included over a million dollars’ worth of mechanical work which consisted of a new HVAC…
-
Chapman Elementary School – Anchor Point, AK
The Chapman Elementary School project consisted removal of hazardous materials and replacement of exterior windows and siding. This also included other misc finishes on the exterior and interior to complement the main points of the contract. Blazy was able to work in the confines of the time frame to get the long lead siding ordered…
-
Kenai Reservoir #2 – Kenai, AK
The Kenai Reservoir project consisted of large diameter underground water pipe to be tied into the existing City water lines for the new 1-million-gallon water storage tank erected onsite. The storage tank itself included welded steel sheets built on a concrete foundation. The finishes were completed with priming and painting of the entire tank inside…
-
Alyeska Resort Howitzer Storage No. 1 – Girdwood, AK
The Alyeska Resort Howitzer Storage project consisted of a two story storage facility to house one of the main artillery guns to set off avalanches at the resort. This includes upgraded structural elements needed consisting of heavy concrete walls for the basement portion of the project as well as structural steel/engineered wood combination for the…
-
Girdwood Alyeska Chair 6 Barn Reconstruction
The Alyeska Resort Chair 6 Barn Reconstruction included working from the existing foundation from the old Chair 6 Barn prior to burning down. In doing so Blazy had to redo some of the structural supports and also add an additional slab on grade with a cap on the existing slab. The concrete could not be…
-
Bison Hall
The Bison Hall project is a 6,059 square foot building that houses educational dioramas, offices for staff, restrooms and a dining area for guests. The building is constructed with an open layout and exposed lumber to give it a craftsman, barn like feel. The concrete slab, being the finished flooring, was poured and then stamped…
-
Tordrillo Mountain Lodge
Tordrillo Mountain Lodge is a remote, luxury lodge on Judd Lake that is only accessed by helicopter or float plane. This job consisted of 6 new buildings and 1 addition to the existing lodge. The project presented a number of challenges including completing all construction in a 6 month time frame during the winter months…