Kenai Peninsula College
This 19,370 SF facility houses the Process Technology, Instrumentation, and Electronics Programs.
Three large labs for instrumentation, electronics, and simulation and a smaller fabrication lab are the core learning spaces of the building. The building also contains three classrooms, a small conference room, eight offices for faculty offices, work area for an administrative assistant, workroom/break area, and student collaborative spaces.
The building was constructed primarily as a Design-Bid-Build project, but the University added a Design Build component for the training equipment. Blazy hired a designer for this component of the project and ran it as a separate Design-Build job. The value of the Design-Build component to date is $1,248,822.
Blazy’s Role: Prime Contractor
Construction Budget: $9,193,181 (current)
Construction Period: July 2012, ongoing
Delivery Method: See description for method
Owner: UAA