Homer Seniors 9-Plex
This project was the final of three senior housing projects (two in Homer and one in Anchor Point) that were constructed under a Design Build contract.
Blazy successfully competitively bid for the schematic design and to provide a cost estimate for construction.
This project presented a challenge because of a natural creek that ran under the building site. Additionally, the lot was long and narrow, so our design solution was a building with 4 different levels and 54 corners. Though this solution presented a higher degree of complexity for the construction team, it was the right solution for the client.
Once the owners got the money from the State, they chose to use Blazy for the management and construction of the projects. On all three projects, Blazy worked closely with the owner’s representative, subcontractors, suppliers, and the design team to construct a building that was completed on time and within budget.
Blazy’s Role: Prime Contractor
Construction Cost: $2,130,255
Construction Period: 2007
Delivery Method: Design-Build
Owner’s Representative: Fred Lau