Kenai Community Library
The Kenai Community Library Expansion project was elegant and simple. The design followed an approach which introduced a less academic yet more familiar and social space. The design consisted of a pure and rectilinear addition to the existing library with projecting nooks, fins, and canopies which resulted in a dynamic exterior design, while establishing private…
-
Alaska Vocational Technical Center Maritime Facility
Blazy Construction was responsible for this Design-Build project, which included the design and construction of 3,492 SF free standing metal building with a 2,300 SF Mezzanine. Also added to the project was a piling foundation and canopy over a fire training simulator. The new facility provides AVTEC with a space for instruction and the practical…
-
AVTEC Distance Learning Center
The Design-Build Team of Blazy Construction and WHPacific (as ASCG) provided complete A/E services and construction for the 4,787 square foot AVTEC Distance Training Center. The Center was based on program requirements for topography and video conferencing that required acoustical control of interior spaces. To provide excellent sound isolation from outside sources (STC 55+), we…
-
Homer Seniors 9-Plex
This project was the final of three senior housing projects (two in Homer and one in Anchor Point) that were constructed under a Design Build contract. Blazy successfully competitively bid for the schematic design and to provide a cost estimate for construction. This project presented a challenge because of a natural creek that ran under…
-
Kenai High School Pool Addition
This was a very quick design/build public facility project, which took six-weeks from beginning to end, including permits. The building was complete and ready for the installation of the simulator on the exact day we listed on our original work timeline. The owners were flawlessly using the facility at the end of the six weeks….
-
Kenai Lake Work Center Incident Command – Multipurpose Admin Building
This project was a 5,200 SF wood framed single story structure located 24 miles out of Seward. The alternate delivery method utilized on this project was a two part proposal consisting of graded qualification packet and price proposal packet. In this scenario, the government is only required to provide a debriefing to the proposer explaining…
-
Marathon Oil Company Office
This was a 3,200 SF office building in Kenai, competitively bid as a design/build. This project went very smoothly and the owner was very pleased with the process and the end result. Because Marathon Oil is very proactive with safety, the important feature in this project was safety. This building was directly by the front…
-
Soldotna Equipment Warm Storage and Maintenance Administration Building
Blazy Construction and WHPacific (as ASCG) worked within a limited timeframe to provide the City of Soldotna design and construction services for this design/build project. The project required construction to commence before winter for 8,400-SF heavy equipment warm storage facility and a 1,800-SF administrative building. This was a fast-track project designed and constructed within six…
-
South Peninsula Hospital Addition – Homer, AK
Blazy Construction was the prime contractor for this two-story steel structure, 16,800 square foot addition to the South Peninsula Hospital located in Homer. When this project bid it came out $250,000 over budget. The borough requested that Blazy Construction (low bidder) work with them to value engineer certain aspects of the project. With a collaborative…