Kenai High School Pool Addition
This was a very quick design/build public facility project, which took six-weeks from beginning to end, including permits. The building was complete and ready for the installation of the simulator on the exact day we listed on our original work timeline. The owners were flawlessly using the facility at the end of the six weeks….
-
Tyee HUD 5-Plex
This was a project for Central Peninsula Counseling Services and was funded by HUD. It is 6000 square foot, single story, wood framed structure on a monolithic slab on grade. Five contractors were asked to propose and we were the low bidder. However the project was over budget and we were asked to work with…
-
Homer Seniors 8-Plex
On this project we were requested to provide a cost estimate to accompany a schematic drawn by the architect for grant proposal. Once the owner secured the grant for construction funding they elected to use Blazy as the contractor. We worked closely with Mr. Lau and Bill Kluge to keep this project within the funds…
-
Kenai Lake Work Center Incident Command – Multipurpose Admin Building
This project was a 5,200 SF wood framed single story structure located 24 miles out of Seward. The alternate delivery method utilized on this project was a two part proposal consisting of graded qualification packet and price proposal packet. In this scenario, the government is only required to provide a debriefing to the proposer explaining…
-
Kenai River Center
This project was a 10,000 square foot structure. A single story wood framed building it was built as an administrate office complex. Although the basic structural design is somewhat different than the proposed project we feel this building had many features that could be incorporated into the new project such as extensive aluminum storefront, in…
-
Alaska Vocational Technical Center Maritime Facility
Blazy Construction was responsible for this Design-Build project, which included the design and construction of 3,492 SF free standing metal building with a 2,300 SF Mezzanine. Also added to the project was a piling foundation and canopy over a fire training simulator. The new facility provides AVTEC with a space for instruction and the practical…