SPH Operating Room – Homer, AK
The SPH Operating Room Project consisted of a full renovation to the existing two operating rooms in the facility. This was always done while maintaining one open operating room throughout the duration of construction. The main portion of the project included over a million dollars’ worth of mechanical work which consisted of a new HVAC unit. Blazy was able to perform the work on time while maintaining infection control processes that resulted in zero incidents during construction. This also included all new finishes throughout including the hallway areas as well as electrical upgrades in the operating rooms.
Blazy’s Role: General Contractor
Construction Cost: 1,700,000
Construction Period: April ’17 – Oct. ‘17
Delivery Method: Design-Bid-Build
Owner: Kenai Peninsula Borough
A/E Firms: Architects Alaska, BBFM, RSA Engineering