• Blazy Alaska Commercial Construction - KPC Building
  • Blazy Inc. - Alaska Construction Contractors - KPC Building Rear
  • Blazy Inc. - Alaska Construction Contractors - KPC Building Exterior Daytime
  • Blazy Inc. - Alaska Construction Contractors -KPC Building Interior 1
  • Blazy Inc. - Alaska Construction Contractors - KPC Building Interior 2
  • Blazy Inc. - Alaska Construction Contractors - KPC Building Interior 3

Kenai Peninsula College

This 19,370 SF facility houses the Process Technology, Instrumentation, and Electronics Programs.

Three large labs for instrumentation, electronics, and simulation and a smaller fabrication lab are the core learning spaces of the building. The building also contains three classrooms, a small conference room, eight offices for faculty offices, work area for an administrative assistant, workroom/break area, and student collaborative spaces.

The building was constructed primarily as a Design-Bid-Build project, but the University added a Design Build component for the training equipment. Blazy hired a designer for this component of the project and ran it as a separate Design-Build job. The value of the Design-Build component to date is $1,248,822.

Blazy’s Role:  Prime Contractor

Construction Budget:  $9,193,181 (current)

Construction Period:  July 2012, ongoing

Delivery Method:  See description for method

Owner: UAA